Health, Safety and Environmental Orientation
For contractors, consultants and subcontractors working at Yangarra sites
You can stop any job that is not safe.
Tell your Yangarra supervisor right away and explain why. You will not be disciplined for refusing dangerous work in good faith.
This is a short course of 14 pages, about 15 minutes with the voice-over. Press Next to move on. A 12-question quiz follows. You pass with 10 correct answers, and the six critical questions must all be right. When you pass, your completion is sent to Yangarra automatically. Show your completion card to the Yangarra supervisor at check-in.
This is a summary. Alberta law, Yangarra’s procedures and site rules apply on top of it. “Must”, “shall” and plain instructions are mandatory. “Should” and “may” are not essential.
Part A: Your duties and rights
A1. Who completes this orientation, and when
- Complete it before any work at a Yangarra site.
- Escorted visitors get a shorter briefing. Your subcontractors complete this orientation too.
- Keep your own record of who completed it and when.
A2. Who is in charge on site
- Yangarra’s work site supervisor is your contact. Report hazards, incidents and spills to that person.
- Where several employers share a site, the prime contractor coordinates safety. Follow its direction.
- Check in on arrival, and know the hazards, permits and emergency plan before you start.
A3. Your rights and duties
- You have the right to know the hazards of your work, and the duty to ask when you are unsure.
- You have the right to participate in safety, and the duty to report unsafe conditions at once.
- You have the right to refuse work you believe, on reasonable grounds, is dangerous. Tell your supervisor immediately and explain why. You cannot be disciplined for refusing in good faith.
- Do not do work you are not competent to do, unless a competent worker directly supervises you.
A4. Tickets and penalties
Alberta OHS officers can issue tickets on the spot to employers and to workers who break the rules.
Part A: Fit for duty and conduct on site
A5. Fit for duty
- Yangarra has zero tolerance for drugs and alcohol. Alcohol, illegal drugs and cannabis are not allowed on any Yangarra location or in vehicles on a location.
- Arrive fit for work. Impairment also comes from medication, fatigue, illness or stress.
- If a medication or health condition could affect safe work, tell your supervisor before you start.
A6. Hours of work and fatigue
Fatigue is a hazard. Take enough rest and days off, and say so if you are too tired to work safely.
A7. Drugs, alcohol, smoking and vaping
- Yangarra has zero tolerance for drugs and alcohol. No drugs or alcohol are allowed on any Yangarra location, or in any vehicle on a location. This includes cannabis, even though it is legal in Alberta, and all illegal drugs. Prescribed medication is covered in A5.
- Employers are expected to make sure their own procedures on alcohol and drug use align with Yangarra policies.
- Smoking and vaping of tobacco or nicotine are allowed only in an area your Yangarra supervisor designates, at least 25 metres from any possible ignitable vapour.
- Not in vehicles on non-smoking sites. Strike-anywhere matches and single-action lighters are forbidden.
A8. Working alone
Follow Yangarra’s working alone procedures. Contractors need their own plan, with a way to check in and get help.
A9. Violence and harassment: zero tolerance
- Yangarra has zero tolerance for violence and harassment. This applies to everyone on a Yangarra location, including Yangarra employees, contractors, subcontractors and visitors.
- Violence is physical force, attempts or threats to use it, and damage to property. Harassment is unwelcome conduct such as bullying, intimidation, offensive comments or jokes, and conduct aimed at someone because of who they are. A threat is still a threat if it is said as a joke.
- Anyone who commits violence or harassment will be removed from the location, and Yangarra may bar them from returning.
- Alberta’s OHS Code requires a prevention plan covering reporting and investigation. Report any incident to the Yangarra supervisor right away, whether it happens to you or you see it. If you feel unsafe, leave the area first. Do not retaliate against anyone who reports.
Part A: Training and contractor requirements
A10. Training you must have
Hold current certificates, and be able to show them, in Standard First Aid and CPR, H2S Alive or an equivalent, and WHMIS. Your work may also need Transportation of Dangerous Goods, Confined Space Entry, Ground Disturbance, or BOP and Well Control.
A11. What contractors must have in place
Contractors must have competent, trained workers, written procedures for medium and high-risk tasks, hazard assessments and permits when required, respirator training and fit testing, and current Workers’ Compensation coverage. They also need $2 million general liability and $2 million vehicle liability insurance. Their procedures on alcohol and drug use must align with Yangarra policies. Subcontractors complete this orientation and carry comparable coverage.
Part B: Hazards and permits
No job starts until the hazards are identified and controlled.
B1. Hazard assessment
- A hazard assessment identifies the job’s hazards, how each is controlled, who is responsible, and the protective equipment needed.
- The whole crew takes part. For most non-routine work, the Safe Work Permit includes it. Repeat it when a process starts or changes.
B2. Safe Work Permits
The Yangarra supervisor who knows the work issues a Safe Work Permit for non-routine work.
| Permit | Covers |
|---|---|
| Hot work | Any ignition source that could cause a fire or explosion |
| Cold work | Ignition sources are isolated but other risks remain |
| Confined space entry | Tanks, vessels, pits and manholes |
| Ground disturbance | Excavating and trenching |
| Electrical | Electrical equipment work |
| Vehicle entry | Vehicles in hazardous locations |
- Do not deviate from the permit, even if another method looks safer.
- If you think the job should be done differently, stop work and ask the Yangarra supervisor to follow up on the job task before you continue.
- If conditions change, stop and get a new permit.
B3. Pre-job safety meetings
Hold one at the start of every workday, at the start of a new job, and whenever conditions change. Review the hazards, the permit, roles, equipment and emergency procedures. It is always okay to ask.
Part B: High-risk work
B4. Hot work and ignition control
- Hot work needs a Safe Work Permit and continuous gas monitoring.
- It counts as hot work when an ignition source is within 25 metres of facilities or hydrocarbon sources, or a vehicle is within 7.5 metres.
- Phones, cameras, flashlights and other equipment that is not intrinsically safe stay out of areas where hydrocarbon vapours could be present, unless a hazard assessment and hot work permit allow it.
- Collect flammable liquids in bonded or grounded metal containers, never plastic.
B5. Confined spaces
Every entry needs a permit, a hazard assessment and a pre-job meeting. Workers need confined space training, and the safety watch needs rescue training. Contractors never enter tanks, vessels or sumps without the supervisor’s authorization.
B6. Lockout and tagout
Follow Yangarra’s lockout and tagout practice. Locks isolate energy, tags show who applied them, and the job needs a hazard assessment and a permit.
B7. Ground disturbance
Follow Yangarra’s Ground Disturbance Code of Practice. Locate and confirm underground lines before breaking ground.
B8. Working at heights
Use a CSA-approved harness and shock-absorbing lanyard when you could fall more than 3 metres, or less where the landing would be worse than flat ground. Use it from 1.2 metres on permanent installations without guardrails.
Part B: Emergencies, reporting and fire
B9. Emergencies
- The supervisor reviews emergency procedures and runs drills.
- When an alarm sounds, shut down your equipment and walk directly to the designated evacuation point. Do not run, and do not go back for belongings.
- If you notice a leak, a gas smell or an unusual noise from equipment, tell the Yangarra supervisor or operator right away and follow the site emergency plan.
- On sour gas sites, follow the wind direction instructions and stay at the muster point until told it is safe. Do not attempt a rescue without training and equipment.
B10. Reporting accidents, incidents and near misses
- Report every accident, incident and near miss to the Yangarra supervisor immediately. A near miss is an event that could have been an accident.
- Yangarra’s Accident Report Form is due to Health and Safety within 24 hours.
B11. Spills and releases
Control a release if it is safe to, and report every spill immediately, including small ones inside a facility. Never burn waste.
B12. Fire and explosion hazards, and fire prevention
The supervisor identifies fire and explosion hazards in the hazard assessment, and contractors follow IRP 18. The main causes of fire are electrical faults, poor housekeeping, smoking, improper welding and poor maintenance. Fight a fire only within your training. Otherwise sound the alarm, evacuate and call the fire department.
Part C: Protective equipment and gas detection
Using the right protective equipment is a legal duty, and contractors supply it.
C1. Personal protective equipment
| Equipment | Minimum requirement |
|---|---|
| Head | Hard hat meeting a Part 18 standard, worn at all times on site. No caps or toques under it. |
| Feet | Safety-toed footwear meeting a Part 18 standard. |
| Eyes | Safety eyewear. Goggles or a face shield around chemicals, and a face shield when grinding. |
| Hearing | Protection where noise exceeds 85 dBA, and both plugs and muffs above 100 dBA. |
| Clothing | Outer clothing and gloves suited to the task. Fire-resistant outer clothing where flammable atmospheres are possible. No nylon where hydrocarbons are present. |
- If your clothing is soaked with hydrocarbons, use the deluge shower before removing it.
C2. Gas detection and atmospheric monitoring
- Wear a 4-gas monitor for H2S, LEL, oxygen and CO on the outside of your clothing.
- Bump test or function test it before every shift.
- Before entering a shed or building, wait for it to ventilate, then test the air.
- Oxygen below 19.5% or above 23% is a concern.
C3. Respiratory protection
Wear a full-face SCBA or supplied air respirator when H2S is above 10 ppm or oxygen is below 19.5%. Anyone who may need one must be trained, fit tested and clean-shaven where the mask seals. Contractors supply their own.
C4. First aid and emergency equipment
First aid kits and emergency equipment must be stocked and easy to reach before work starts.
Part C: Site practices
C5. Hazardous materials and waste
Chemicals must be labelled under WHMIS, with Safety Data Sheets on site. Yangarra must approve a chemical before it comes on site. If a chemical is not identified, do not use it. Store waste in approved containers and dispose of it at approved facilities.
C6. Housekeeping, tools and equipment
Clean up after yourself and keep walkways clear. Never block gas detectors or alarm sensors. Inspect tools before use, and tag defective ones out of service. Only authorized people operate power tools. Lift with your legs and do not twist.
C7. Ladders, scaffolds, loads and site security
Ladders must be CSA approved and tied off at the top, with one person on at a time. Scaffold tags: green is safe, yellow is caution, red is unsafe, and no tag means do not use it. Never work under suspended loads. Ask unrecognized people for identification.
Part C: Driving and vehicles
C8. Driving and vehicles
- Drive within posted limits and to conditions. Everyone wears a seat belt.
- Hand-held phones are not allowed while driving. Hands-free is fine, and you may call emergency services.
- Diesel equipment within 25 metres of a gas source needs at least a manual positive air shut-off. Tank trucks, vacuum trucks, backhoes, service rigs and hot oil units need an automatic shut-off.
- Secure all cargo. No flammable material in the cab, and no firearms.
- Keep vehicles at least 7.5 metres from wellheads, piping, vessels and tanks unless a permit allows it.
- On an ATV, wear a CSA-approved helmet, stay on Yangarra leases and rights-of-way, and carry communications gear in remote areas.
Part D: Drilling
Drilling rigs, completion crews and producing facilities each add hazards.
D1. Drilling
- On arrival, find the muster point and the wind direction indicators.
- Stay out of the drill floor and any area the rig supervisor has restricted.
- Tell the driller or rig supervisor immediately about an unexpected rise in mud tank level, unexpected flow from the well, a change in mud returns, or a gas alarm. Then follow the well control and emergency plan.
- Never use your hands or feet to stop or steer rolling drill pipe or tubulars over 3.5 inches. Load and unload them with a picker or loader.
Part D: Completions and well servicing
D2. Completions, stimulation and well servicing
- While pressure testing or pumping, stay outside the marked restricted zone and away from high-pressure lines and treating iron, unless the supervisor has cleared you in.
- Never tighten or work on a connection under pressure. Report a leak, shut down and bleed off first.
- Service rigs, hot oil units, tank trucks and vacuum trucks need an automatic air shut-off device.
- Flowback and well testing can release flammable or toxic gas. Control ignition sources, keep vehicles at least 7.5 metres away, and keep gas monitors reading.
Part D: Production operations
D3. Production operations
- A producing location is live. Only authorized Yangarra operators open, close or bypass valves, reset or bypass emergency shutdown systems, or silence alarms. If your job needs one, ask the Yangarra supervisor or operator.
- Check in with the operator when you arrive and when you leave.
- Before entering a shed or building, wait for it to ventilate, then test the air.
- Do not open tank hatches or gauge tanks unless you are authorized and your gas monitor is reading.
- Never open a line or vessel that may be under pressure until it is isolated and depressurized under a permit.
- Report leaks, odours, unusual noises and alarms immediately.
Important numbers
| Emergency services | 911 |
|---|---|
| Yangarra emergency number | 403-262-9558 |
| Your Yangarra work site supervisor | Get the name and number when you check in |
| Your own company contact | Write it down before you start work |
Take the quiz
The quiz has 12 questions. You pass with at least 10 correct answers, and the six questions marked critical must all be right. If you do not pass, you will go back to the start of the course and read it again before you try the quiz again. When you pass, your completion is sent to Yangarra automatically. Show your completion card to your Yangarra supervisor when you check in.